Projects

Burn Boot Camp – Waukesha

This 9,300 square foot buildout for Burn Boot Camp – Waukesha consisted of a new locker room, child watch, reception, remodeled restrooms, as well as the new workout area with the Burn Boot Camp floating floor.

Mukwonago Animal Hospital

This project consisted of a 2,316 square foot log cabin addition with a walkout lower level, as well as a complete remodel of the existing clinic. This project added new kennels and play area on the lower level, as well as a new lab, exam rooms, surgery room, and x-ray room on the first floor. The existing reception, waiting, and exam rooms were also completely remodeled.

Peltz Center for Jewish Life – Mequon

This project included a new 37,303 square foot addition and remodel of the existing 7,606 square foot Synagogue. The addition included a new Synagogue with mezzanine, meat and dairy kitchens, Library, Chapel, and Rotunda Gallery. The existing building was remodeled into preschool classrooms.

631 N Broadway Facade Renovation

A complete renovation of a historic downtown Milwaukee facade. The project included new foundations and back filling of the existing sidewalk vaults, new cream city brick facade with granite base, three new aluminum storefronts, and new arched windows on the 2nd floor.